Warning: Undefined variable $version in /home/sumtmamit/public_html/wp-content/themes/tmwp2019/functions.php on line 170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sumtmamit/public_html/wp-includes/functions.php on line 6170

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341
Yandhai Nepean Crossing Chainwire Fencing - Summit Fencing
Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Yandhai Nepean Crossing


Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341
Seymour White Constructions

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341
1 Memorial Ave, Penrith NSW 2750, Australia

Project:

The Roads and Maritime Services engaged Seymour White to construct a new pedestrian and cyclist bridge across the Nepean River between Penrith and Emu Plains. The new bridge, which was opened on 29 October 2018, has a long single span of 200m and weighs over 600 tonnes.

Summit Fencing was contracted by Seymour White at the beginning of the project to supply and install semi-permanent chainwire fencing around the site compound. The bridge was constructed in a large shed within this compound, and as each section was completed it was pushed out over the river.

Towards the completion of project, the temporary fencing was then pulled down and permanent chainwire fencing was reinstalled. Other fencing works completed by Summit were rural fencing around properties on the western banks, and a short run of black flat top tubular fencing at the entrance to the bridge on the eastern bank.​


Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Scope of Work:

  • Temporary chainwire fencing
  • Permanent 1.5m and 1.8m high galvanised chainwire fencing with barbed wire and gates
  • Permanent 1.8m high black chainwire fencing and gates
  • Rural fencing
  • Tubular flat top fencing powder coated black

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341

Warning: advanced_custom_search(): Argument #2 ($wp_query) must be passed by reference, value given in /home/sumtmamit/public_html/wp-includes/class-wp-hook.php on line 341