acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sumtmamit/public_html/wp-includes/functions.php on line 6170Frasers Property Australia commenced the $70 million cold storage and food production warehouse for PFD Food Services at their six-hectare site in Chullora in mid-2017. The 22,208-square-metre facility was completed late 2018, and became PFD’s second major food storage hub.
Summit Fencing were subcontracted by Frasers to supply and install all fencing requirements. The number of different components needing to be installed simultaneously created a challenge for Summit, however being experienced in large projects and with all manufacturing done in-house, the project was completed before time and to a very high standard.